St. Louis Division
Tuesday, November 18, 2014
Adding Gridded Ceiling
Laying track in the division point yard
Craig victor is laying track to later be glued in the division point yard
Installed grade crossing flashers
These grade crossings are automatic with infrared detectors that detect the train as is passes through a certain area
Adding More Sintra
Howard is making a outline in masking tape as a template to help guide him to cut the plastic (
Sintra)
road.
Tuesday, November 11, 2014
Laying Sintra roads
Pat Lenahan is working on sintra roads as seen here
Installing a lighted building. With stop light flasher.
Interior wiring for external in internal lighting.
Finished scene
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)