St. Louis Division
Tuesday, November 18, 2014
Adding Gridded Ceiling
Laying track in the division point yard
Craig victor is laying track to later be glued in the division point yard
Installed grade crossing flashers
These grade crossings are automatic with infrared detectors that detect the train as is passes through a certain area
Adding More Sintra
Howard is making a outline in masking tape as a template to help guide him to cut the plastic (
Sintra)
road.
Tuesday, November 11, 2014
Laying Sintra roads
Pat Lenahan is working on sintra roads as seen here
Installing a lighted building. With stop light flasher.
Interior wiring for external in internal lighting.
Finished scene
Tuesday, October 28, 2014
10-28 work night
New carpet installed
City scene
View down the street.
More mainline laid.
The Shop: Adding new couplers
Steve Hottle is adding Katie couplers to rolling stock
The Shop: Wiring grade crossings
Keith Robinson is Connecting grade crossings to an automatic circuitboard.
Laying track.
Craig Victor is laying a Industry spur on the right side of the division point yard.
Stephen Arnold is planning the layout of the Division Point yard
Sidewalks being added
Howard Is making sidewalks and pavement markings for a Hotel in a city seen.
Monday, September 1, 2014
Electrical light features in building
Airbrushing the city pavement
Adding a grey wash to the city streets
Saturday, August 23, 2014
Saturday work night
Priming bondo joints
Prior to priming
Recessed switch controller holes
Recessed switch controller
Gas charged piston for lift bridge assistance.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)